RedSealPlumberExam

🔥 Hydronic Heating and Cooling Systems

What this topic covers

Major Work Activity F of the RSOS Plumber 2023, low-pressure steam and hydronic systems: 16 of the 125 questions. Task F-16 (low-pressure steam) is not tested on the interprovincial exam; Task F-17 (hydronic piping systems) carries 9 questions and Task F-18 (heating and cooling equipment) carries 7. These are original study notes for practice questions, not Red Seal program documents. Most points are standard methods and notions of the trade; code points are based on the National Plumbing Code of Canada 2020, the edition handed out at the exam.

Layouts and flow

Expansion tank, air and components

Fill water and fluid

Boilers and controls

Solar and cooling

Testing and troubleshooting

Take the free test · full question bank and mock exams with a subscription

Sample questions (5)

1. Which piping arrangement carries all of the water through each terminal unit in turn?

  1. Two-pipe direct return.
  2. Two-pipe reverse return.
  3. Primary-secondary loops.
  4. One-pipe series loop.

In a one-pipe series loop the same water passes through every terminal unit one after the other, so each unit takes its heat from the water that left the unit before it. Direct return and reverse return are two-pipe layouts where each unit has its own branch off the supply and return mains, and primary-secondary piping joins separate circuits through closely spaced tees.

2. Which heat transfer fluid is the usual choice where a leak could reach occupants or potable water?

  1. Propylene glycol blend.
  2. Ethylene glycol solution.
  3. Methyl alcohol brine.
  4. Calcium chloride brine.

Propylene glycol has low toxicity and is the standard antifreeze where a leak could contact people or the potable supply. Ethylene glycol is toxic, methyl alcohol is both toxic and flammable, and calcium chloride brine is highly corrosive to the metals in a hydronic system.

3. Where is an automatic air vent normally installed in a hydronic piping system?

  1. At the lowest point of the loop.
  2. On the return beside the boiler.
  3. At a high point of the piping.
  4. Beside the circulator inlet.

Air rises, so it collects at high points and that is where an automatic vent releases it. The lowest point collects sediment and is where a drain goes, and the boiler return and the circulator inlet are not places where air gathers.

4. A new PEX hydronic loop is ready for its pressure test. Which source gives the test pressure and duration?

  1. Manufacturer and AHJ requirements.
  2. The circulator nameplate head rating.
  3. The expansion tank pre-charge.
  4. The fill valve factory setting.

Sub-task F-17.03 of the RSOS has the hydronic system tested according to the specifications and the AHJ, so the test pressure and duration come from the pipe and component manufacturers and the authority having jurisdiction. The circulator nameplate head, the tank pre-charge and the fill valve setting are operating data for other components and do not set a test value.

5. Why is a new hydronic loop flushed before it is filled with treated water?

  1. To raise the static pressure of the loop.
  2. To remove flux, oil and loose debris.
  3. To cool the boiler before start-up.
  4. To pre-charge the expansion tank.

New piping contains flux, cutting oil and chips that foul valves and circulators and weaken inhibitors, so the loop is flushed first. Flushing does not raise static pressure, it is not a cooling step, and the tank pre-charge is set on the air side with a gauge.

Start free

RedSealPlumberExam · Topics · Exam guide · Sample questions