RedSealPlumberExam

🔧 Tube, Tubing and Pipe: Preparation and Joining

What this topic covers

Major Work Activity B of the RSOS Plumber 2023, preparing and joining tube, tubing and pipe: 13 of the 125 questions. Task B-6 (preparing pipe) carries 6 questions and Task B-7 (joining it) carries 7. These are original study notes for practice questions, not Red Seal program documents. Code points are based on the National Plumbing Code of Canada 2020, the edition handed out at the exam; trade points describe standard methods of the trade. Where to look in the code: Articles numbered 2.2. for materials and 2.3. for joints and connections.

Inspecting pipe before use

Cutting, bending and preparing ends

Copper and plastic joints

Steel, cast iron and specialized pipe

Connections and movement

Calculations

Take the free test · full question bank and mock exams with a subscription

Sample questions (5)

1. A length of pipe delivered to site has no maker's mark or identification. What is done with it?

  1. Install it after a pressure test.
  2. Reject it and do not install it.
  3. Install it where it is concealed.
  4. Mark it by hand and install it.

Article 2.2.1.3. of the NPC 2020 requires every length of pipe to carry the maker's name or mark and its class or quality, or to be marked as the relevant standard states, so unmarked pipe is rejected (sub-task B-6.01 of the RSOS). A pressure test, a concealed location or a handwritten mark does not replace the required identification.

2. A plumber rejects salvaged copper tube that once carried fuel oil for a new potable water line. Which NPC reason applies?

  1. It was used for a non-potable purpose.
  2. It is older than the current code edition.
  3. It has not had a new pressure test.
  4. It was cut from an existing system.

Article 2.2.1.2. of the NPC 2020 does not permit materials once used for a purpose other than distributing potable water to be used later in a potable water system, and a fuel oil line is such a use (sub-task B-6.01 of the RSOS). The NPC does not bar a material because it is old or because it was removed from an existing system, and no pressure test lifts this restriction.

3. Soil along a planned buried steel line is found to be excessively corrosive. What does the NPC require?

  1. Increase the pipe size by one NPS.
  2. Apply extra pipe dope at each joint.
  3. Use only materials suited to that soil.
  4. Wrap the pipe in plain building paper.

Sentence 2.2.1.1.(1) of the NPC 2020 allows only materials suited for the location to be used where conditions such as excessively corrosive soil exist (sub-task B-6.01 of the RSOS). A larger pipe, extra pipe dope or a paper wrap does not make the material suited to the corrosive soil.

4. How is a length of cast iron pipe checked for hidden cracks before installation?

  1. Weigh it against a catalogue weight.
  2. Run a tapered mandrel through it.
  3. Measure its length with a tape.
  4. Tap it and listen for a clear ring.

Sounding is the tactile and auditory inspection named in sub-task B-6.01 of the RSOS: a sound cast iron pipe rings clearly when tapped, while a cracked one gives a dull note. Weighing, a mandrel or a length measurement cannot reveal a hairline crack.

5. After steel pipe is cut with a wheel cutter, what removes the burr left inside the pipe end?

  1. Ream the bore of the pipe end.
  2. File a bevel on the outside edge.
  3. Flare the pipe end with a tool.
  4. Swage the pipe end to enlarge it.

A wheel cutter pushes metal inward and leaves a burr that narrows the bore, so the end is reamed (sub-task B-6.02 of the RSOS). Filing the outside edge leaves the inside burr, while flaring and swaging reshape the end of tube and do not remove a burr.

Start free

RedSealPlumberExam · Topics · Exam guide · Sample questions