RedSealPlumberExam

⚙️ Specialized Systems

What this topic covers

Major Work Activity G of the RSOS Plumber 2023, specialized systems, carries 9 of the 125 exam questions: task G-19, process piping systems (5); task G-21, other specialized systems such as medical gas, compressed air, fuel gas, irrigation and ground source loops (4). Task G-20, fire protection systems, is not tested on the interprovincial exam. These are original practice notes, not Red Seal program documents. Code points are based on the National Plumbing Code of Canada 2020 (NPC 2020), the edition provided at the exam; trade points reflect standard methods and notions of the trade. The exam is open book, so the notes also say where to look in the code. Non-potable and rainwater systems are in Section 2.7 of Division B.

Corrosive and laboratory waste

Process piping

Non-potable water systems

Rainwater harvesting

Irrigation backflow

Other specialized systems

Take the free test · full question bank and mock exams with a subscription

Sample questions (5)

1. A laboratory sink discharges acid waste. Where does the waste go before the sanitary drain?

  1. A grease interceptor.
  2. A neutralizing tank.
  3. A sand interceptor.
  4. A backwater valve.

Article 2.4.4.4. of the NPC 2020 requires a fixture that discharges acid or corrosive waste to drain into a neutralizing or dilution tank, which is connected to the sanitary drainage system through a trap or an indirect connection. A grease interceptor and a sand interceptor remove fats and solids rather than acidity, and a backwater valve only stops sewer backflow.

2. A neutralizing tank receives corrosive waste from a plating shop. How is its vent routed?

  1. Join it to the nearest stack vent.
  2. Join it to the vent header above.
  3. End it inside the roof space.
  4. Run it independently to the outdoors.

Article 2.5.5.3. of the NPC 2020 requires the vents of corrosive waste drain piping and neutralizing tanks to extend independently and terminate outdoors. Joining a stack vent or a vent header would carry corrosive vapour into the general venting system, and ending in a roof space would release it inside the building.

3. A plumber lays out floor drains for several clients. In which room is a floor drain prohibited from connecting to a drainage system?

  1. A school boiler room
  2. A public laundry room
  3. A solvent storage room
  4. A parking garage level

Article 2.4.3.4. of the NPC 2020 does not permit a floor drain in a room where flammable, dangerous or toxic chemicals are stored or handled to be connected to a drainage system, so the solvent storage room drain stays unconnected. The Article does not cover a laundry room, a boiler room or a parking garage, so floor drains there may be connected to drainage, with an oil interceptor for the garage under Sentence 2.4.4.3.(2).

4. Which pipe is permitted for drainage of acid waste from a laboratory?

  1. Galvanized steel pipe.
  2. Hard copper DWV tube.
  3. Borosilicate glass pipe.
  4. ABS plastic DWV pipe.

Article 2.2.8.1. of the NPC 2020 requires pipes and fittings for acid and corrosive waste to conform to the high-silicon iron, borosilicate glass or polyolefin and PVDF laboratory drainage standards it lists. Galvanized steel, copper and ABS are not among the listed materials, and the first two are attacked by acid.

5. A reclaimed water system is installed in a factory. Which fixture is it permitted to supply?

  1. A drinking fountain.
  2. A wall-hung urinal.
  3. A hand wash lavatory.
  4. An emergency eyewash.

Sentence 2.7.1.1.(2) of the NPC 2020 limits a non-potable water system, outside the rainwater harvesting Subsection, to water closets, urinals, trap seal primers and directly connected underground irrigation. A drinking fountain, a lavatory and an eyewash involve drinking or contact with the body, so they stay on the potable system.

Start free

RedSealPlumberExam · Topics · Exam guide · Sample questions