Major Work Activity G of the RSOS Plumber 2023, specialized systems, carries 9 of the 125 exam questions: task G-19, process piping systems (5); task G-21, other specialized systems such as medical gas, compressed air, fuel gas, irrigation and ground source loops (4). Task G-20, fire protection systems, is not tested on the interprovincial exam. These are original practice notes, not Red Seal program documents. Code points are based on the National Plumbing Code of Canada 2020 (NPC 2020), the edition provided at the exam; trade points reflect standard methods and notions of the trade. The exam is open book, so the notes also say where to look in the code. Non-potable and rainwater systems are in Section 2.7 of Division B.
Corrosive and laboratory waste
- Neutralizing or dilution tank: acid or corrosive waste drains to one, connected to the sanitary system through a trap or an indirect connection (Article 2.4.4.4.).
- Vents: run independently and end outdoors (Article 2.5.5.3.).
- Chemical rooms: a floor drain where hazardous chemicals are stored or handled is not connected to a drainage system (Article 2.4.3.4.).
- Materials: high-silicon iron, borosilicate glass, or polyolefin and PVDF laboratory drainage pipe (Article 2.2.8.1.); not copper, galvanized steel or ABS.
Process piping
- High-purity water: RO water attacks copper; PVDF, polypropylene and stainless steel are standard choices.
- Food grade: tri-clamp ferrules with a gasket give a crevice-free bore that opens for cleaning.
- Material choice: the manufacturer's chemical resistance data govern, by chemical, concentration and temperature.
- Passivation: restores the chromium oxide film on stainless welds after heat tint.
Non-potable water systems
- Uses: outside rainwater harvesting, only water closets, urinals, trap seal primers and directly connected underground irrigation (Sentence 2.7.1.1.(2)); never fixtures in healthcare facilities (Sentence 2.7.1.1.(3)).
- Piping: marked under Article 2.7.1.2.; not directly above food or drink areas or a potable water tank (Article 2.7.1.3.).
- Outlets: never where they can discharge into a fixture for food or drink (Article 2.7.1.4.).
Rainwater harvesting
- Rainwater: storm water from an above-ground roof (Article 2.7.2.1.); Note A-2.7.2.1.(1) explains why driveways and lawns are unsuitable.
- First flush: at least 0.3 L per square metre of roof (Clause 2.7.2.4.(4)(a)); a 150 square metre roof gives 45 L.
- Make-up water: an RP backflow preventer or an air gap (Sentence 2.7.2.4.(9)).
Irrigation backflow
- AVB: downstream of the control valve, under pressure only while it is open (Sentence 2.6.2.10.(2)).
- PVB: listed in Sentence 2.6.2.2.(2) and built for continuous supply pressure.
Other specialized systems
- Medical gas: copper is brazed with nitrogen flowing inside to prevent oxide scale.
- Compressed air: branches leave the top of the main; drains go at low points.
- Propane: heavier than air, it collects in low spots such as sumps.
- Ground loop: purged at high flow until no air returns, before the pressure test.
- Boyle's law: P1 x V1 = P2 x V2 with absolute pressures (gauge + atmospheric). 600 L at 600 kPa gauge, with 100 kPa atmospheric: 600 x 700 / 100 = 4 200 L. The formula sheet is provided at the exam.
Sample questions (5)
1. A laboratory sink discharges acid waste. Where does the waste go before the sanitary drain?
- A grease interceptor.
- A neutralizing tank.
- A sand interceptor.
- A backwater valve.
Article 2.4.4.4. of the NPC 2020 requires a fixture that discharges acid or corrosive waste to drain into a neutralizing or dilution tank, which is connected to the sanitary drainage system through a trap or an indirect connection. A grease interceptor and a sand interceptor remove fats and solids rather than acidity, and a backwater valve only stops sewer backflow.
2. A neutralizing tank receives corrosive waste from a plating shop. How is its vent routed?
- Join it to the nearest stack vent.
- Join it to the vent header above.
- End it inside the roof space.
- Run it independently to the outdoors.
Article 2.5.5.3. of the NPC 2020 requires the vents of corrosive waste drain piping and neutralizing tanks to extend independently and terminate outdoors. Joining a stack vent or a vent header would carry corrosive vapour into the general venting system, and ending in a roof space would release it inside the building.
3. A plumber lays out floor drains for several clients. In which room is a floor drain prohibited from connecting to a drainage system?
- A school boiler room
- A public laundry room
- A solvent storage room
- A parking garage level
Article 2.4.3.4. of the NPC 2020 does not permit a floor drain in a room where flammable, dangerous or toxic chemicals are stored or handled to be connected to a drainage system, so the solvent storage room drain stays unconnected. The Article does not cover a laundry room, a boiler room or a parking garage, so floor drains there may be connected to drainage, with an oil interceptor for the garage under Sentence 2.4.4.3.(2).
4. Which pipe is permitted for drainage of acid waste from a laboratory?
- Galvanized steel pipe.
- Hard copper DWV tube.
- Borosilicate glass pipe.
- ABS plastic DWV pipe.
Article 2.2.8.1. of the NPC 2020 requires pipes and fittings for acid and corrosive waste to conform to the high-silicon iron, borosilicate glass or polyolefin and PVDF laboratory drainage standards it lists. Galvanized steel, copper and ABS are not among the listed materials, and the first two are attacked by acid.
5. A reclaimed water system is installed in a factory. Which fixture is it permitted to supply?
- A drinking fountain.
- A wall-hung urinal.
- A hand wash lavatory.
- An emergency eyewash.
Sentence 2.7.1.1.(2) of the NPC 2020 limits a non-potable water system, outside the rainwater harvesting Subsection, to water closets, urinals, trap seal primers and directly connected underground irrigation. A drinking fountain, a lavatory and an eyewash involve drinking or contact with the body, so they stay on the potable system.