What this topic covers
Major Work Activity C of the RSOS Plumber 2023, sewers, sewage treatment and DWV systems, carries 32 of the 125 exam questions: task C-8, building sewers (7); task C-9, sewage treatment systems (5); task C-10, drainage, waste and vent systems (20). These are original practice notes, not Red Seal program documents. Code points are based on the National Plumbing Code of Canada 2020 (NPC 2020), the edition provided at the exam; trade points reflect standard methods and notions of the trade. The exam is open book, so the notes also say where to look in the code. Most rules sit in Sections 2.4 (drainage) and 2.5 (venting) of Division B.
Building sewer and private systems
- Building sewer: starts where it joins the building drain, 1 m outside the building wall (Article 1.4.1.2. of Division A). A combined building drain is not permitted (Sentence 2.1.2.1.(2)); Note A-2.1.2.1.(2) explains but does not change this.
- Ball test: a ball of at least 50 mm for NPS 3 or more (Article 2.3.6.7.). Cleanout spacing is in Table 2.4.7.2.
- Backwater valve: on fixture drains below the adjoining street level, or one on the branch serving them (Sentences 2.4.6.4.(1) and (2)); a trap seal cannot hold back a surcharged sewer.
- Sump: 24 h capacity if not automatic, water- and air-tight and vented for sewage (Article 2.4.6.3.).
- Septic: the outlet baffle keeps scum in the tank; a holding tank serves soil that cannot take a field; wet ground, odours and slow fixtures mean a failing field; a percolation test sizes the field. Sizes and distances are set by the AHJ.
Sizing drainage
- Fixture outlet pipe: waste opening to trap; the fixture drain runs from the trap on (Article 1.4.1.2. of Division A).
- Hydraulic load: fixture units per fixture in Table 2.4.9.3.; stack loads in Table 2.4.10.6.-A; building drains in Table 2.4.10.6.-C through Article 2.4.10.8.
- Water closets: drainage at least NPS 3; a stack serving more than 6 is at least NPS 4 (Sentences 2.4.9.2.(1) and (3)).
- Slope: NPS 3 or less at least 1 in 50, or 20 mm per metre (Sentence 2.4.8.1.(1)).
- Storm: roof area plus half the largest adjoining wall times the 15 min rainfall (Sentence 2.4.10.4.(1)); leaders in Table 2.4.10.11.
Fittings and interceptors
- Cross: never in a drainage system; a plain T only to connect a vent (Article 2.2.4.1.). Sanitary T fittings are barred in nominally horizontal drainage pipes (Sentence 2.2.4.2.(1)).
- Grease interceptor: no garbage grinder upstream; an organic solids interceptor may be (Article 2.4.3.3.). Harmful waste is treated first (Article 2.4.4.1.).
Venting
- Wet vent: no more than 2 water closets (Clause 2.5.2.1.(1)(b)).
- Circuit vent: joins the fixture drain of the most upstream fixture; the relief vent goes downstream of the last fixture (Sentence 2.5.3.1.(3)).
- Vent stack: needed on a stack draining more than 4 storeys (Sentence 2.5.4.2.(1)); a stack vent is the stack's own upward extension.
- Connection: above the centre line of a horizontal drain, except wet vents (Sentence 2.5.6.2.(2)). Trap arm lengths: Table 2.5.6.3.; individual vents: Table 2.5.7.1. through Article 2.5.8.2.
- Air admittance valve: not in plenums or where it may freeze; at least 100 mm above the fixture drain; one vent must still end outdoors (Article 2.5.9.3., Clause 2.5.9.2.(2)(a)).
Testing, service and calculations
- Water test: at least a 3 m column on all joints for 15 min (Article 2.3.6.4.).
- Troubleshooting: gurgling in a clear drain points to a restricted vent (frost: Sentence 2.5.6.5.(6)); an evaporated trap seal gives sewer odour; roots are cut mechanically, then camera-checked.
- Formulas: pressure = height x 0.433 psi/ft. (25 ft. gives 10.8 psi); drop = run / 50 at 1 in 50 (45 m gives 0.90 m); box volume = L x W x H, 1 cubic metre = 1 000 L. The formula sheet is provided at the exam.
Sample questions (5)
1. Where does the building sewer of a house begin?
- At the base of the soil stack
- At a point 1 m outside the wall
- At the edge of the property
- At the public sewer main line
The definition in Article 1.4.1.2. of Division A of the NPC 2020 places the start of the building sewer where it joins the building drain, 1 m outside a wall of the building; from there it runs to the public sewer or to a private sewage disposal system. The base of the soil stack is inside the building, on the building drain. The edge of the property is only a point the sewer passes, and the public sewer main is where the building sewer ends, not where it begins.
2. A building sewer joins the public sewer downstream of the main cleanout. What is the minimum pipe size?
- NPS 2
- NPS 3
- NPS 4
- NPS 6
Article 2.4.9.4. of the NPC 2020 requires a building sewer connected to the public sewer downstream of the main cleanout to be at least NPS 4. NPS 2 and NPS 3 are smaller than the minimum. NPS 6 is acceptable, but it is a larger size than the minimum the Code asks for.
3. What is the NPC 2020 minimum slope for an NPS 3 drainage pipe, in millimetres of drop per metre of run?
- 10 mm per metre
- 20 mm per metre
- 40 mm per metre
- 50 mm per metre
Sentence 2.4.8.1.(1) of the NPC 2020 sets a minimum slope of 1 in 50 for drainage pipes of NPS 3 or less, which is 20 mm of drop for each metre of run. A drop of 10 mm per metre is 1 in 100, which is too flat. A drop of 40 mm per metre is 1 in 25 and 50 mm per metre is 1 in 20; both are steeper than the minimum, so neither is the minimum slope.
4. A building on a combined public sewer is being rebuilt. How must its new drainage piping be arranged?
- Separate drains joined inside the wall
- A single shared building drain
- One drain with a backwater valve
- Separate sanitary and storm drains
Sentence 2.1.2.1.(2) of the NPC 2020 does not permit a combined building drain, even where the public sewer is combined, so sanitary and storm piping are run as separate building drains. Joining the two drains inside the wall, sharing one drain, or adding a backwater valve to one shared drain all still create a combined building drain. Note A-2.1.2.1.(2) explains that some localities have accepted combined building drains on past performance, but a Note explains and does not change the requirement.
5. Row houses are built on separate lots beside one public sewer. How are their building sewers connected?
- Each building has its own connection.
- The whole row shares one connection.
- Pairs of houses share a connection.
- Middle units tie into end units.
Article 2.1.2.4. of the NPC 2020 says piping in a building connected to public services is connected separately from the piping of any other building. Sharing one connection among all houses or among pairs breaks this rule, and middle units cannot tie into end units. The exception is an ancillary building on the same property, such as a garage, which may use the same service.